Project Date : April 2023

When Tottenham Hotspur planned to extend their training ground, the new press conference room called for the best possible glazing solution. Super-size quad-glazed, acoustic glass was selected and Trust in Safe Hands were on hand to plan and execute the lift.

Our fleet of equipment made light work of moving, placing and lifting the glass into position. On hand were two Hoeflon C6e mini-cranes, two DSZ2 vacuum lifters, a Kappel 2000 vacuum lifter and our tracked carrier, as well as our own personnel to supervise and operate.

For more information about the equipment used on this project, visit the “Our Equipment” area of the site.

 